As part of the renovations to the Library a Sprinkler System is being installed in the front section of the Library starting with Level 3. On Monday July 9th the entire front area of level 3 (the old Library) will be closed. Ask at the Welcome Desk for books in that area to be retrieved for you. We expect to be able to deliver them to you within 30 minutes of the request.
The workstations on level 3 (in the extension) will not be affected by this.
Once the first stage of sprinkler installation is finished, sections of level 3 will be re-opened. After this, Levels 4 and 5 will be affected.